Open Access Charges by State 2026-27: Maharashtra, Gujarat, Rajasthan and MP Compared

The same solar plant can cost you about ₹0.24 per kWh in network charges in one setup and over ₹3 in another. That gap is often bigger than the difference between two PPA offers.
We compared Maharashtra, Gujarat, Rajasthan and Madhya Pradesh for HT industrial consumers, using the latest FY 2026-27 regulatory orders. Here's the short version:
Third-party buyers pay roughly ₹2.56 to ₹3.36 per kWh in network charges before they pay for a single unit of power. Gujarat is the cheapest and Madhya Pradesh the dearest.
Maharashtra levies no additional surcharge, but its cross-subsidy surcharge is the highest of the four at about ₹2.11, and banked solar can only be drawn in solar hours.
Gujarat has the lowest wheeling charge, but its additional surcharge resets every six months.
Group captive cuts the bill to ₹0.24 to ₹0.81 per kWh. Once CSS and additional surcharge fall away, Gujarat is the cheapest state and Maharashtra the dearest.
All figures below are indicative, per kWh, for HT industry. Regulators revise them often, so treat this as a map, not a quote.
What sits between the plant and your meter
Your landed cost is the generation cost plus every charge the grid adds on the way. Six items do most of the damage:
Wheeling charge and loss. You pay the discom a per-kWh fee for carrying the power, and a percentage of the energy is deducted as loss.
Transmission charge. Applies when power moves over the state transmission network, usually for plants connected at higher voltage.
Cross-subsidy surcharge (CSS). Compensates the discom for losing a consumer who pays a higher tariff. Third-party buyers pay it. Qualifying captive and group captive buyers don't.
Additional surcharge (AS). Recovers the discom's stranded power purchase costs. Some regulators reset it every six months.
Banking charge or restriction. Solar generates at noon and you consume around the clock. How the state lets you bank and draw that energy decides how much of the plant you really use.
SLDC, scheduling and deviation charges. Small per unit, but they add up on a variable source.
Add these to the energy cost and you have the number that decides the project.

State by state, FY 2026-27
Maharashtra: no additional surcharge, high CSS, solar-hour banking
Wheeling: ₹0.81 per kWh at HT, ₹1.60 at LT, as approved by MERC for FY 2026-27, with about 7.5% wheeling loss at HT. Confirm with MSEDCL whether it is billed per kWh or per kVAh.
CSS: about ₹2.11 per kWh for HT industry under MERC's March 2026 order. Qualifying captive and group captive consumers don't pay it.
Additional surcharge: MERC did not approve one for the current control period. Some developers report MSEDCL billing it to group captive users, so check your bills.
Banking is the catch. The banking charge is 8% of banked energy, settled in kind. Settlement is monthly and slot-wise, and energy banked in solar hours can only be drawn in solar hours, roughly 9 am to 5 pm. A plant sized for annual energy can still leave you buying evening power at full tariff. APTEL has stayed bills under the new banking rules for some appellants only.
Watch two things. MERC's draft Distribution Open Access Regulations 2026 propose exemptions from CSS and AS for dedicated storage. And a September 2026 MERC ruling says captive renewable power gets no priority over third-party power in energy credit adjustment, which matters for group captive structures.
Gujarat: cheapest wheeling, moving surcharge
Wheeling: ₹0.2352 per kWh at HT, with wheeling loss cut to 6.5%.
CSS: ₹1.33 per kWh for HT.
Additional surcharge: reset by GERC every six months. It went from ₹1.00 (Oct 2025 to Mar 2026) to ₹0.76 (Apr to Sep 2026) and is now ₹0.99 until March 2027.
Banking: the green energy open access banking charge was ₹1.50 per kWh on an interim basis and has been revised more than once this year. Check the current rate before you sign.
Rajasthan: surcharges came down
CSS: ₹1.48 per kWh, down from ₹1.58 last year.
Additional surcharge: ₹0.50, down from ₹0.72.
Wheeling: from ₹0.01 at EHV to roughly ₹0.6 at 11 kV. The range goes higher at lower voltages.
Green consumers: pay a further ₹0.05 per kWh on the applicable tariff. For captive plants, CSS and AS aren't charged upfront if you file the required undertaking, but they can be recovered if captive status later fails.
Madhya Pradesh: highest CSS, banking rules now clearer
CSS: ₹1.49 per kWh, up from last year.
Additional surcharge: lowered in the FY 2026-27 order, at roughly ₹1.2 for third-party supply. It doesn't apply to power sourced from captive plants.
Wheeling and transmission: ₹0.17 at 33 kV, ₹0.69 at 11 kV, plus about ₹0.46 for transmission.
Rules: MPERC now adjusts energy and demand in 15-minute blocks and wants a clear contract demand declaration. A banking procedure for green energy open access took effect in August 2026.
Side by side: HT industry, ₹ per kWh
Third-party buyers pay wheeling, CSS and AS. Group captive buyers pay wheeling only.
State | Wheeling (HT) | CSS | Additional surcharge | Banking | Third-party total | Group captive total |
Maharashtra | 0.81 plus 7.5% loss | 2.11 | Not levied | 8% in kind, solar-hour draw only | 2.92 | 0.81 |
Gujarat | 0.24 plus 6.5% loss | 1.33 | 0.99 | Charge under revision | 2.56 | 0.24 |
Rajasthan | about 0.62 (11 kV) | 1.48 | 0.50 | Under green energy OA rules | 2.60 | 0.62 |
Madhya Pradesh | about 0.69 (11 kV) | 1.49 | about 1.18 | Banking procedure from Aug 2026 | 3.36 | 0.69 |
Totals exclude transmission, SLDC, scheduling and deviation charges, and wheeling losses.

Structure beats geography
Look at the two right-hand columns above. For third-party supply, the order from cheapest to dearest is Gujarat, Rajasthan, Maharashtra, Madhya Pradesh, and the bill runs from ₹2.56 to ₹3.36. For group captive, it's Gujarat, Rajasthan, Madhya Pradesh, Maharashtra, and the bill runs from ₹0.24 to ₹0.81. Even the cheapest third-party state costs more than the dearest group captive one, because CSS and AS are the biggest line items, and group captive avoids both.

Third-party PPA. The simplest to sign, but you carry every charge. In these four states that's roughly ₹2.6 to ₹3.4 per kWh on top of the energy price. Maharashtra has no additional surcharge, but its CSS is the highest of the four.
Group captive. Pay wheeling only, as long as you hold at least 26% equity and consume at least 51% of the plant's output. Status is tested every year, and if you fail it, the surcharges come back with a bill for the past.
CAPEX. You own the plant, so the energy cost is lowest, and an offsite captive pays wheeling and banking only. You also carry the O&M and the generation risk.
Three mistakes we see again and again:
Comparing PPA tariffs without adding the network charges.
Sizing the plant for annual energy and ignoring how banking works in that state.
Treating surcharges as fixed. Gujarat's additional surcharge has changed at every six-month reset since October 2025.
Check your own number
These tables are a starting point. Your voltage level, contract demand, load profile and plant type change the answer. Our free ENERCO Open Access Calculator applies each state's open access rules, including capacity limits and banking, and compares the landed cost of solar, wind and hybrid power under CAPEX, group captive and third-party models. It covers Maharashtra, Gujarat, Rajasthan, Karnataka, Tamil Nadu, Madhya Pradesh and Uttar Pradesh, and you can request a free detailed savings report.
Related reading from ENERCO
Group Captive Renewable Energy Projects: 7 Pitfalls to Avoid Before You Sign, on captive status, equity and consumption tests.
Virtual PPA vs Open Access, if you are comparing contract structures.
Maharashtra RE Policy 2026 and MSEDCL's Tariff Order, for the Maharashtra rules behind these numbers.
Renewable Energy PPA Playbook, our wider guide to buying renewable power.
Renewable Energy and Carbon Glossary, for terms like CSS, wheeling and banking.
About ENERCO
ENERCO Energy Solutions LLP is an independent renewable energy advisory firm. We don't sell hardware, we don't do EPC, and we don't take vendor commissions, so our advice on structure and state has no side to take. Our IIT-Bombay and Harvard + Cambridge certified sustainability experts have worked on 400+ sites and decarbonized 1.8 bn+ kWh in 17+ years.
Want a second opinion on a PPA, a group captive structure or a state choice? WhatsApp us on +91 20 35904874 or write to info@EnercoEnergySolutions.com.
Figures are indicative, based on the latest regulatory orders for FY 2026-27, and can change. Confirm current rates before signing any agreement.